| Date: |
7-15-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
24-03a |
|
|
Steps 1-4 Attach rollbar assembly to the rollbar base Match drilled the 12 holes on the sides of the rollbar assembly Removed, deburred and primed all parts. |
||