Date:    7-15-2013
Number of Hours:    2.00
Brief Description:    24-03a
Steps 1-4
Attach rollbar assembly to the rollbar base
Match drilled the 12 holes on the sides of the rollbar assembly
Removed, deburred and primed all parts.