Date:    6-10-2013
Number of Hours:    0.00
Brief Description:    23-04b
Step 8
Inserted the F1234 L&R canopy decks and F1255 L&R longerons into the fuselage skeleton.
Cleco the canopy decks to the upper tab
Notice the left longeron has got a siight twist inboard and will need to adjust and re-install.
Also noticed that the lip overhanging the F1234R may not protrude enough on the left canopy rail.
Don't think it's a showstopper, but need to think about that.