| Date: |
5-18-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
22-02a |
|
|
Steps 1-4 Installed nut plates on the upper flanges of the F1217A tunnel ribs Machine countersunk all nut plate attach holes on the F1272 forward fuselage skin Final drilled the engine mount brackets to the F1217A tunnel ribs |
||