Date:    2-7-2015
Number of Hours:    2.00
Brief Description:    
Steps 1-8
Fabricating the side hinges, cowl hinge pins, cowl top right hinge pin, cowl top left hinge pin, cowl lower hinge pins, and mid-cowl hinge pins.
Beveling the eyelets of the F-1201J upper cowl hinge.