| Date: |
7-31-2014 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Stabilator cables |
|
|
Steps 1-3 Routed aft stabilator cables forward thru the F1207B and F1206A bulkheads Routed the forward stabilator cables aft thru the holes in the 1204A & D bulkheads Connected the stabilator control cables using the barrel turnbuckle. |
||