| Date: |
3-7-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
elevator installation |
|
|
installed the elevators. had to trim quite a bit of the HS skins to allow for the counterbalance arm to swing through. trimmed about 7/8", but it turned out nice and i have the 1/8" min gap called for in the plans. should be enough room for fiberglass build up. |
||