Date:    4-14-2008
Number of Hours:    3.00
Brief Description:    floor/bulkhead interface, front seat
trimmed off a bit of the lower bulkhead flanges at the point where the floor boards pass under when installing/removing. there is only a very small gap under which to pass the floor boards and as a result the floor boards tend to get gouged up when going in & out. hopefully this will prevent damage to the painted floors when installing.

finished up the front seatback. had to cut remove some material from the seatbelt cutouts.