Date:    8-25-2013
Number of Hours:    3.00
Brief Description:    Wiring Checks
Wiring continuity checks. Going wire by wire, pin to pin, checking continuity of all runs. Found a serial line for comms between HXr and EIS missing. Got that one installed and checked.