Date:    5-10-2008
Number of Hours:    4.00
Brief Description:    Cowl Flap 4
I fabricated a 90 deg bellcrank to convert pulling a push-pull cable pull to cowl flap opening, and made and tack welded a torque tube arm after making a control linkage.