Date:    4-23-2010
Number of Hours:    1.50
Brief Description:    AOA Mounting 2
I installed the upper surface AOA bits; they included thermistors for the AOA heat and drilling a hole in the lower access panel so the AFS drain probe could drain the upper fitting without removing the panel.