| Date: |
4-23-2010 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
AOA Mounting 2 |
|
|
I installed the upper surface AOA bits; they included thermistors for the AOA heat and drilling a hole in the lower access panel so the AFS drain probe could drain the upper fitting without removing the panel. |
||