| Date: |
9-18-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Aileron Balance Tube Riveting |
|
|
I installed the balance tubes into the ailerons using wide dome, long grip stainless steel 1/8 inch rivets from McMasters. I used a right angle prick to help pull the tubes into the leading edge. |
||