| Date: |
6-5-2005 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Completed HS front spar |
|
|
Finish drilled, corrosion protected and riveted together the front spar for the horizontal stabilizer. attached spar caps, doubler, and bolt down brackets. |
||