Date:    12-27-2009
Number of Hours:    7.00
Brief Description:    Spar tunnel
Pilot drilled the spar tunnel Z's and the firewall and floor stiffeners into place. There are a lot of holes in this floor. I'm glad I decided to roll the fuselage on it's side to work. This keeps most of the work at the perfect height.