| Date: |
9-13-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Assemble #1 Crosstie Box |
|
|
Finished assembly of the #1 crosstie box. The bottom cover will be riveted later after the attach point hardware is installed and torqued because the box will cover it. |
||