| Date: |
6-20-2011 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Wing Rigging Day 2 |
|
|
Day 2. Setup, leveling and squaring went much faster since we left the wings in place from yesterday with the aft spar bolted in place. I decided to use the multiple bit method of gradually increasing the main spar hole that many have used with success. I took my time and continually cleared the chips and let the bit stay cool while drilling. It was a bit nerve racking but job complete. Again we ran out of daylight and I needed to push the 152 back inside for the night. |
||