Date:    5-14-2011
Number of Hours:    4.00
Brief Description:    Panel Assembly and Wiring
Loaded the panel with the EFIS, COM and transponder along with most of the switches, ELT control head, inclinometer and vents.

The middle hole will hold a second MGL EFIS once I save up enough cash to buy it.

Then on to the interior to add some more wires.