Date:    2-20-2005
Number of Hours:    10.00
Brief Description:    Ribs to spar
Spent Saturday and Sunday riveting the left ribs to the front and rear spars. A little slow starting, adjusting the pressure of the rivet gun. Drilled out 2 bad rivets...not too bad. Got the tap out and tapped the hole for the tie down ring. Slow going as the hole was undersize for the ring I got from Vans. Clecoed the top and bottom skins so I can match drill all holes.