| Date: |
2-20-2005 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Ribs to spar |
|
|
Spent Saturday and Sunday riveting the left ribs to the front and rear spars. A little slow starting, adjusting the pressure of the rivet gun. Drilled out 2 bad rivets...not too bad. Got the tap out and tapped the hole for the tie down ring. Slow going as the hole was undersize for the ring I got from Vans. Clecoed the top and bottom skins so I can match drill all holes. |
||