| Date: |
12-26-2016 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Wire runs |
|
|
Continued running wires throught he fuselage. Ran the float landing gear wire to the center of the fuselage. Ran the battery, Flaps, magnetos, comm antenna, Strobr/position, and engine control wire down the left side. Ran strings to pull the headset wiring down the left side. |
||