| Date: |
10-12-2017 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Tail, nose |
|
|
Routed and anchored the trim wire op the trailing edge of the vert. staboilizer. Installed the horizontal stab tips. Initial installation of the nose bowl and windshield. installed the elevators and rudder. |
||