| Date: |
6-22-2017 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Float steps and ADAHRS |
|
|
Finished installing the last area of wing walk on the floats. Drilled the float rigging and nstalled the steps on each side. Removed the steps to be powder coated. Reinstalled the replacement primary ADAHRS. |
||