| Date: |
2-21-2017 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
wiring and engine |
|
|
Installed the doubler for the ADS-B in antenna and installed the antenna. Installed the throttle cables up to the engines. Modified the carburators according to the Aircam manuals. |
||