| Date: |
11-7-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Prepping for paint |
|
|
Trimmed the top fairing for the verticle stabilizer and riveted it on. Finished fitting the verticle stabilizer lower firing. Finished the preliminary fit of the throttle assemblies and removed them for painting. |
||