| Date: |
6-20-2016 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Inspection panels |
|
|
Began assembling the inspection panel doublers for the lower center section skins. Drilled for the nutplates, disassembled and deburred the holes |
||