| Date: |
4-1-2016 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Verticle and left elevator |
|
|
Finished riveting the fittings to the front stabilizer spar. Began working on the rear spar but had to stop due to a back ordered fitting. Went back to work on the left elevator. Drilled numerous hole out to #19 now that we have black clecos. |
||