Date:    3-31-2016
Number of Hours:    4.30
Brief Description:    Verticle Stabilizer
Deburred the front stab spar and spar doublers. Filed the edges of the doublers. Primed the front spar and other small part for the spar. Assembled the elevator hinge brackets. Deburred the rivet holes in the stabilizer ribs.