| Date: |
2-19-2004 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Hook up breaks and reinstall firewall |
|
|
Installed break fluid resivoir and hook up break lines. Routed lines to rear of landing gear and tied down to floorboard. Reinstall firewall and rivet in place with monel 3/32 rivets. Installed motor mount and torque all bolts to 60 in #. |
||