Date:    3-2-2004
Number of Hours:    5.00
Brief Description:    Panel layout
Installed panel and did autocad layout of panel to take to Steffis for Laser cuting. Located a better 1" bender and re did the 1" cooling tubes for the Rotax. Checked for clearance of insturments and determined that we have needed clearance.