Date:    6-22-2010
Number of Hours:    2.00
Brief Description:    Wire Fabrication, Installation
Fabricated wiring for both right and left wings as per Steps 1 and 2, page 40-05.

Pulled wires through right wing and installed them to the right wing terminal bracket.

Installed molex connector on landing light as per Steps 1-5, page 40-06.