| Date: |
4-25-2010 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Spinner Installation |
|
|
Adjusted track of spinner as per Steps 1-3, page 47-04. Match-drilled all spinner to spinner plate holes and gap fillers as per Stpes 1-6, page 47-05. Fabricated gap filler back plates, installed all nutplates, and installled spinner. Torqued hub mount bolts but left propeller blades off in preparation for cowling installation. |
||