Date:    4-25-2010
Number of Hours:    6.00
Brief Description:    Spinner Installation
Adjusted track of spinner as per Steps 1-3, page 47-04.

Match-drilled all spinner to spinner plate holes and gap fillers as per Stpes 1-6, page 47-05.

Fabricated gap filler back plates, installed all nutplates, and installled spinner. Torqued hub mount bolts but left propeller blades off in preparation for cowling installation.