| Date: |
4-10-2010 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Engine Preparation |
|
|
Continued reassembly of engine. Removed carbs and installed drip pans. Installed fuel line assembly. Began final prep of firewall for hanging of engine by drilling lower mount/nose gear bracket holes. |
||