| Date: |
4-7-2010 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Engine Preparation |
|
|
Continued preparation of engine for installation by preparaing for and installing engine mount as per page 46-05 and 46-06. Installed cooling shroud to engine with high temp RTV as per Steps 1-2, page 46-07. |
||