Date:    4-4-2010
Number of Hours:    1.50
Brief Description:    Engine Preparation
Continued preparations of engine for installation as per Steps 2-5, page 46-03 and Step 4, page 46-04.

Also installed spare fuse holder to back of map box door as per Steps 9 and 10, page 42-03.