| Date: |
12-22-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Rudder Cables |
|
|
Reinstalled vertical stablizer and rudder in preparation for rudder cable installation. Installation completed according to Steps 1-4, page 11-02 and all attach bolts torqued to 30 in-lbs and marked with torque seal. Installed rudder cables as per Steps 1-7, page 32-11 and Steps 1-2, page 32-12. |
||