Date:    12-18-2009
Number of Hours:    3.50
Brief Description:    Flaperon Install, Torque Tube Drilling
Mike came over and assisted with installation of flaperons, Steps 1-3, page 30-04.

Wings were installed to the fuselage and then the flaperons were positioned and drilled as per Steps 3 and 4, page 32-09 and Steps 1-5, page 32-10.