| Date: |
12-13-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Brake Lines |
|
|
Attached brake reservoir lines to brake reservoir as per Step 2, page 32-02. Secured brake lines to bottom of panel base with cushioned clamp as per Step 3. Fabricated F-1289D-L&R brake caliper lines as per Step 3, page 35-04. Reinstalled wing spar rollers and guides (removed during interior painting). |
||