Date:    11-14-2009
Number of Hours:    6.50
Brief Description:    Fuselage Wiring
Performed final install of control sticks and wiring as per pages 31-11 and 32-05.

Routed PTT wiring, installed ground wire terminals and secured ground wires as per page 31-11.

Installed over rudder wireway and organized wire bundle around rudder pedal location as per page 31-13.

Reinstalled rudder pedal assembly and torqued to 25 in-lb.

Finished installation of pins in 37 pin d-sub and installed backshell.

Installed 9 pin d-sub on data line and installed back shell.

Installed ELT bracket.