| Date: |
11-14-2009 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Fuselage Wiring |
|
|
Performed final install of control sticks and wiring as per pages 31-11 and 32-05. Routed PTT wiring, installed ground wire terminals and secured ground wires as per page 31-11. Installed over rudder wireway and organized wire bundle around rudder pedal location as per page 31-13. Reinstalled rudder pedal assembly and torqued to 25 in-lb. Finished installation of pins in 37 pin d-sub and installed backshell. Installed 9 pin d-sub on data line and installed back shell. Installed ELT bracket. |
||