| Date: |
11-9-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Fuselage Wiring |
|
|
Installed grips on control sticks and drilled grip plugs for PTT switches. Installed PTT harnesses in grip plugs. Prepared control stick bushings and filed control stick pivot tubes as per Steps 2-4, page 32-05. |
||