| Date: |
3-6-2010 |
|
| Number of Hours: |
6.75 |
|
| Brief Description: |
Canopy Fiberglass Started |
|
|
Finished prep for fiberglass by sanding the canopy foam and marking, masking, and roughing bonding surfaces as per Steps 1-3, page 34-15. Installed fiberglass to both sides of the canopy as per Steps 6-8, page 34-14. Applied peel ply following installation. Cut strips of glass fabric as per Step 1, page 34-15. |
||