| Date: |
10-31-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Forward Firewall Upper |
|
|
Installed oil tank side braces/battery box assembly to the firewall as per Steps 1-3, page 29-05. Deburred and prepped upper forward fuselage skin, screwed in place, and attached panel attach strips as per Steps 6-10, page 29-05. |
||