Date:    10-31-2009
Number of Hours:    3.00
Brief Description:    Forward Firewall Upper
Installed oil tank side braces/battery box assembly to the firewall as per Steps 1-3, page 29-05.

Deburred and prepped upper forward fuselage skin, screwed in place, and attached panel attach strips as per Steps 6-10, page 29-05.