| Date: |
6-3-2009 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
AST Installation |
|
|
Prepared AST hinge pins and installed the R and L AST assemblies as per Steps 1-4, page 11-04. Installed, tested, and adjusted AST servo assembly as per Steps 8-10, page 11-07 and Steps 1-3, page 11-08. Temporarily fit forward VS skin as per Step 1, page 11-09. Section 11 completed. |
||