Date:    4-11-2009
Number of Hours:    6.50
Brief Description:    Stabilator Spar Box Assembly
Deburred, fluted, radiused, and primed stabilator ribs and rib clips.

Fabricated hinge stops as per Step 1, page 9-05.

Assembled spar box as per Steps 3-5, page 9-05.

Attached all rib clips and ribs as per Steps 1-5, page 9-06.

Installed hinge brackets and torqued to 25 in-lb and installed hinge stop bushings as per Steps 1 and 2, page 9-07.