| Date: |
4-11-2009 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Stabilator Spar Box Assembly |
|
|
Deburred, fluted, radiused, and primed stabilator ribs and rib clips. Fabricated hinge stops as per Step 1, page 9-05. Assembled spar box as per Steps 3-5, page 9-05. Attached all rib clips and ribs as per Steps 1-5, page 9-06. Installed hinge brackets and torqued to 25 in-lb and installed hinge stop bushings as per Steps 1 and 2, page 9-07. |
||