Date:    4-8-2009
Number of Hours:    2.00
Brief Description:    Stabilator Spar Box Assembly
Match-drilled and installed counterbalance brackets and drilled holes in counterbalance arm as per Steps 6-10, page 9-03.

Began attachment of nutplates for control horns and hinge brackets by as per Steps 1-4, page 9-04.