| Date: |
3-21-2009 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Rudder Parts Preparation |
|
|
Separated and deburred rudder parts as per Steps 1-6, page 7-02. Positioned and match-drilled rudder spar caps and deburred holes. Final drilled holes in the WD-1205 rudder horn. Checked rudder hinge alignment by temporarily attaching the rudder spar assembly to the vertical stabilizer as per Step 1, page 7-03. Primed all mating flanges. Riveted the hinge brackets, spar caps and corresponding rib in place as per Steps 2 and 3, page 7-03. Removed forward flange from one rudder rib as per Step 4, page 7-03. |
||