| Date: |
3-20-2009 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Vertical Stabilizer Assembly |
|
|
Completed VS parts preparation, including deburring, fluting, and edge radiusing of ribs as per Steps 1-6, page 6-04 and Steps 1 and 2, page 6-05. Assembled VS skeleton as per Steps 3-8, page 6-05. Prepared VS skins, including trimming, deburring, dimpling, and installation of nutplates as per Steps 1-9, page 6-06. Installed main and foward skins, and uppper hinge assembly as per Steps 1-5, page 6-07. Section 6 completed. |
||