Date:    3-18-2009
Number of Hours:    2.50
Brief Description:    Vertical Stabilizer Parts Preparation
Separated and deburred VS spar parts, marked, and clamped into place for match-drilling. Match-drilled the upper and lower spar caps. Deburred all match-drilled holes. Completed page 6-03.