| Date: |
3-18-2009 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Vertical Stabilizer Parts Preparation |
|
|
Separated and deburred VS spar parts, marked, and clamped into place for match-drilling. Match-drilled the upper and lower spar caps. Deburred all match-drilled holes. Completed page 6-03. |
||