| Date: |
2-6-2009 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Longerons and roll bar attach plates |
|
|
Match-drillled left canopy deck to left longeron. Deburred holes in both right and left longeron and canopy decks. Prepared and installed roll bar attach plates and mid fuse braces (F-1205A and F-1205C) as per Steps 1-4, page 23-03. Prepared mid fuselage skeleton for installation of fuselage side skins by completing Steps 1-8, page 23-04. |
||