| Date: |
1-25-2009 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Tunnel Assembly Completion |
|
|
Attached F-1201L bracket to tunnel rib and firewall bottom as per Steps 8-11, page 22-03. Installed Flo-Scan mount bracket as per Steps 1-3, page 22-04. Attached the tunnel assembly to the mid fuselage section as per Step 1, page 22-05. Section 22 completed. |
||