Date:    1-17-2009
Number of Hours:    5.75
Brief Description:    Completion of Section 21, Start Section 22
Riveted step floors as per Steps 3-4, page 21-19.

Prepared and installed F-1207B bulkhead as per Steps 5-8, page 21-19.

Prepared and installed Facet fuel pump bracket as per Steps 9-11, page 21-19.

Installed six system block studs as per Step 1, page 21-20 (Anna assisted).

Section 21 completed.

Began deburring and countersinking/dimpling tunnel assembly parts, Steps 1 and 2, page 22-02. Fabricated firewall spacers, Step 10, page 22-02.