| Date: |
1-17-2009 |
|
| Number of Hours: |
5.75 |
|
| Brief Description: |
Completion of Section 21, Start Section 22 |
|
|
Riveted step floors as per Steps 3-4, page 21-19. Prepared and installed F-1207B bulkhead as per Steps 5-8, page 21-19. Prepared and installed Facet fuel pump bracket as per Steps 9-11, page 21-19. Installed six system block studs as per Step 1, page 21-20 (Anna assisted). Section 21 completed. Began deburring and countersinking/dimpling tunnel assembly parts, Steps 1 and 2, page 22-02. Fabricated firewall spacers, Step 10, page 22-02. |
||