| Date: |
12-20-2008 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Seat Floors |
|
|
Installed remaining baggage ribs, baggage floors, and bearing bracket assemblies as per Steps 3-8, page 21-03. Assembled crotch strap brackets and installed to seat rib assemblies as per Steps 1-6, page 21-06. Deburred seat floors, separated and deburred seat floor supports and primed mating flanges. Cut, match-drilled, and installed seat back hinges as per Steps 7&8, page 21-06 and Steps 1&2, page 21-07. One slipped during drilling and had to be remade. Will see if enough hinge remains for later steps. Prepared and installed seat floors and supports as per Steps 3-9, page 21-07 and Steps 1-4, page 21-08. Deburred, countersunk, and final-drilled F-1203A bulkhead as per Steps 6&7, page 21-10. |
||