Date:    8-15-2010
Number of Hours:    3.00
Brief Description:    Tailcone Fairing Installation
Installed stabilator and continued with fitting of tailcone fairing as per Steps 3-6, page 12-09. Trimmed stabilator skins as required to produce minimum of 1/8" clearance to tailcone fairing.

Troy assisted in fitting the wings at the hangar for final testing.